Greenway engineers were recently asked to attend a site for a new client on behalf of Lancer Scott to make good the verge fillets on a rear roof apex.

Once the scaffolding was erected, it was discovered that the cement had failed on both sides of the rear apex. A course of tiles was removed from the edge of the property and all loose and failed cement racked out. The whole area was brushed down before being coated with an SBR bonding agent.

Once dried, the roof tiles were put back in place. A cement mix was then prepared and trowelled carefully into the fillet, leaving a professional, neat finish. The entire area was cleaned and all waste removed from the site.

At Greenway, our engineers are multi-skilled and can attend any job no matter how big or small. Call our friendly team today to discuss your requirements.